Trillium has broken the mold of traditional chiller and heat exchange repair. Instead of simply “fixing” broken units, Trillium has developed proprietary, data-based repair scopes of work specific to each make and model. This approach serves to both fix the current issue with your unit, but also perform preventative maintenance to avoid the next preventable failure from costing you downtime. If you are truly interested in “chiller up-time”, you can rely on Trillium to deliver it.
- Evaluation Process
- Repair Process
- Final Test
Trillium will quickly evaluate your temperature control unit to verify the reported symptom that led to it being sent for repair. Then we will identify any additional issues that need be addressed immediately.
After evaluation, Trillium will perform a thorough service of each of the following sub-systems:
Trillium will perform a through final test of your unit to ensure the system is performing as new. Time to temperature, set point maintenance, communication check and many other criteria are measured. Your unit will be returned with our final test report and ready for installation at your facility.
Models we current service:
| Chillers | Heat Exchangers |
|---|---|
| HX75 | AMAT 0 |
| HX150 | AMAT 1 |
| HX300 | Steelhead 0 |
| CFT33 | Steelhead 1 |
| CFT75 | System II |
| CFT150 | System III |
| M33 | System IV |
| M75 | |
| M150 | |
| 2080 | |
| TCU 40/80 |